Newsletter - Links - Advertise - Contact Us - Privacy
 

Buildings Archive 2021

Browse Buildings:
Buildings 31-45 out of 100 displayed.
 [1-15]  [16-30]  [31-45]  [46-60]  [61-75]  [76-90]  [91-100] 
2021
Since opening in 2014 Hauser & Wirth’s art centre in Bruton, Somerset (UK) has become a significant cultural institution creating numerous jobs and drawing hundreds of thousands of people to the area. The farm shop is the latest...

2021
Remodelling of and extension to an existing Victorian villa forming a new kitchen and family dining space, linked out into the garden with a stepped terrace. The extension clearly delineates between old and new with a limited palate of...

2021
Elderpark Housing Association have gone back to the future for their new headquarters, a fully restored Victorian school in Govan. The former Hills Trust Primary School has been transformed at the hands of Mast Architects, who have...

2021
A partnership between Hub West Scotland and the NHS has seen the delivery of two purpose-built acute mental health wards at Stobhill Hospital. Designed by Keppie Design and BAM Construction the £10.7m facility seeks to foster social...

2021
The opening of Forth Valley College’s new Falkirk Campus marked the culmination of 11years of collaboration with Reiach and Hall Architects and the completion of a “family” of 3 campuses in Alloa,Stirling and Falkirk. The new...

2021
Fraser Avenue, a mid-20th century housing estate in Fife, was no longer fit for purpose. Living in one of the most disadvantaged areas in Scotland, residents felt alienated and a lack of belonging. Fife Council engaged 7N to work with the local...

2021
An internal fit out to create a new type of soft-play centre incorporating interactive visual reality games, role playing areas, 3-storey soft play frames and a variety of fun areas for children under 12 as well as a themed restaurant and cafe....

2021
This small project provides a space at the rear of a house for the owners to pause and relax in their garden. The large glass walls provide a visual link to the greenery from the main hallway and leads to a small external seating area. The...

2021
Complex engineering work by multi-award-winning engineering consultancy Will Rudd Davidson has been completed on the fire-damaged clubhouse belonging to Glasgow Golf Club. The club, the ninth oldest in the world, called on the restoration...

2021
The 96 bed Premier Inn hotel and Beefeater restaurantwas delivered via Design and Build with Ogilvie Construction for developer, New Dimension Group. The hotel is built on the site of the former derelict listed Town Hotel on Townhead Street which...

2021
In collaboration with COWI and Burroughs, Moxon Architects has designed and delivered Hams Way Footbridge, a new pedestrian and cycle crossing over Hams Way, Worcestershire for Worcestershire County Council. The bridge forms part of the...

2021
Pupils and teachers at Hilltop Primary in Airdrie will have more reason to cheer than most when they finally get back to school, as their new building has won a national building award. The iconic school building has won Best New Build Project...

2021
Reconfiguration and refurbishment of the Holiday Inn Birmingham (formerly RAF Headquarters built in 1930’s) The refurbishment consisted of 140 bedrooms, main reception and arrival areas with a new restaurant and kitchen. The proposal...

2021
A much-loved community landmark on the southside of Glasgow has been fully restored and repurposed by a leading Scottish architectural firm. The Grade B listed, Andrew Balfour designed former Holmlea Primary School in Cathcart, has been...

2021
Set within a leafy secluded suburban area of Bearsden, our house was developed as a simple one to two storey four bedroom house within a former vacant plot. Previously a domestic tennis court, the confines of the site are strongly defined by a...

Back to Scotland's New Buildings